item8
item11

The Afterburner is an independent installation and we take care of the build from start to finish.

The Afterburner Technical

Crew:
craning

Positioning

We can cope with moderate differences in ground levels and terrain.

Surfaces from grass right through to concerete.

Set Up

4-5 working days until ready for lift off.

All heavy construction is done with our own crane.

Dimensions

Tower height: 10m

Footprint diameter: 22m

Stage approx: 3.5 x 4m

Flaming tree height: 5m

Requirements

One 63 Amp Three Phase supply to be run to the centre of build site.

A cold water point to be run into centre of build site.

Control

Full DMX computer control to performances or music.

FOOTPRINTGRASS

Health and Safety

All installations are built to highest specifications and conform to all required laws and regulations. To download our safety documentation please click the link. For more information please don't hesitate to get in touch. Contact

Download Health & Safety documentation

AerialImage
CONTAINER

GROUND SUPPORT

The Afterburner's main structure is based on an 8 foot shipping container which sits level on the ground. All other seating / staging rests on blocks on the ground with additional small stakes for extra anchorage in soft terrain.The entire installation puts no excessive loads in any one spot.

soundsystem

Sound

Audio is normally provided by Innerfield with up to 20k of excellent sounding and great looking speakers. If you wish to provide your own audio we can work along side the sound engineers to produce the best results for your event.

Lighting

With over 40 L.E.D technology parcans, high powered lasers, 6 Martin moving head lamps and the light from the flame throwers the whole sky is alive with light. However if you wish to add your own to the mix then we can accomodate.

Slide16
FreeCounter